The Hill Group was awarded the mechanical work for the renovation and additions to the central mechanical plant.

The project, to be performed in three phases over three years, includes:

  • demolition of three existing boilers
  • demolition of a centrifugal chiller and an absorption chiller
  • relocation of an existing 1,000 ton and a 650 ton chiller
  • retrofitting the two chillers with variable frequency drives and reworking controls
  • installation of a 1,300 ton cooling tower
  • installation of six base mounted chilled water pumps
  • installation of three new 700 boiler horsepower high pressure steam fire tube boilers with new deaerator, 1,300 gallon condensate receiver, surface blowdown heat recovery system, R.O. boiler make-up water system and stacks
  • installation of a plate and frame heat exchanger for domestic hot water